• Automate step by step.
    Level 2: RUN.

    RUN in detail

RUN: More machine time in day-to-day operations.

Many businesses do not automate because they want to manufacture ‘fully automatically’. They automate because the machine is idle too often during day-to-day operations: whilst being set up, clamped, reconfigured or waiting for the next job. This is exactly where RUN comes in. RUN marks the first tangible step towards increased productivity: whilst the machine is machining, the next pallet is being prepared. The changeover takes place automatically. The spindle remains productive for longer.

Understanding RUN
Efficient palletisation automation
Get started in 3 steps

Set-up takes up more machine time than many businesses would like.

Particularly with individual parts, repeat parts and small batches, there are many interruptions between two jobs. The workpiece is finished. The door opens. The old part is removed. The fixture is released. The next part is clamped in place. Zero points are checked. Only then does the machine start running again. These minutes add up over the course of the day. Skilled staff are tied up, even though the machine could actually be working. The result: less spindle running time, greater time pressure and less predictable capacity.

Find answers to frequently asked questions

Level 2 RUN

More spindle hours.
Less downtime.

RUN marks the start of your manufacturing transformation. Set-up processes run in parallel with machining, thereby minimising downtime and maximising uptime. Value added per hour increases significantly thanks to better utilisation of the machine. The first real leap in productivity.

+ THE CONCEPT: A compact unit comprising a machining centre and pallet storage. Ideal for small to medium batch sizes

+ YOUR BENEFIT: Whilst the machine is working, you can set up the next pallet during active production time. This significantly increases spindle runtime whilst taking up minimal space.

+ HARDWARE: Focus on the compact 6-position changer for very simple operation and fast handling.

Stage 1: READY
Stage 3: GROW
Level 4: STAIRS

Getting started with productive pallet automation.

RUN is a compact combination of a machining centre and a pallet storage system. It is particularly suitable for businesses wishing to reap the initial benefits of automation without having to set up a large-scale system straight away. Whilst the machine is in production, set-up takes place outside the working area. As soon as machining is complete, the system switches to the prepared pallet. RUN is particularly well suited if you:

Leicht drehbare Palettenplätze und ergnomische Höhen vereinfachen die Arbeit an der HEDELIUS MARATHON PL406 Palettenautomation

Reducing set-up times


You want to minimise downtime between two jobs and maximise productive machine time.
HEDELIUS Palettenautomation MARATHON PL406 - Einblick in den Palettenwechsel

Manufacturing small and medium-sized batch sizes


Want to process frequently changing orders cost-effectively and efficiently.
HEDELIUS MARATHON PL406 mit verschiedenen Spannvorrichtungen zur Bearbeitung und fertig gefrästen Werkstücken

Manufacturing repeat parts more productively


You want to produce recurring workpieces with less set-up effort and higher capacity utilisation.
HEDELIUS 5-Achs-Bearbeitungszentrum ACURA 65 MARATHON an HEDELIUS Palettenautomation P406 bei Beladung der Palettenautomation durch einen Kran. Gezeigt wird die Ergonomische Höhe der Rüststation und die Einfachheit bei der Beladung. Auf der Palette ist eine Rüststation montiert.

Reducing the workload on skilled staff


We want to make more targeted use of existing staff and reduce unproductive tasks.
HEDELIUS MARATHON PL406 Palette mit Spannturm und Bohrer für die Bearbeitung durch ein HEDELIUS CNC-Bearbeitungszentrum

Achieving higher output from the same floor space


Want to increase spindle running time without significantly expanding production facilities.
HEDELIUS ACURA 65 MARATHON 5-Achs-Bearbeitungszentrum + HEDELIUS Palettenautomation MARATHON PL406 mit geöffneten Türen

Getting started with pallet automation


Want to make the most of initial automation opportunities without the complexity of a large-scale automation system?

Automation that takes the strain off the operator.

RUN is not intended to make day-to-day production any more complicated. That is why HEDELIUS ensures that the machine, pallet storage system, clamping devices and operator interface are all perfectly coordinated. The operator remains closely involved in the process. They can prepare the next pallet, check dimensions, set up workpieces and monitor the process. Automation does not take over responsibility, but reduces interruptions. This creates a starting point that remains practical and delivers rapid results. HEDELIUS offers three concepts for the RUN stage.


ACURA 50 + MARATHON PL406


Number of pallets: 6
Pallet dimensions: 400x400 / 400x500 mm
Transfer weight: 270/370 kg

ACURA 65 + MARATHON PL406


Number of pallets: 6
Pallet dimensions: 400x400 / 400x500 mm
Transfer weight: 270/370 kg

ACURA 85 + MARATHON PL406


Number of pallets: 6
Pallet dimensions: 400x400 / 400x500 mm
Transfer weight: 270/370 kg

Three steps to extending spindle running time.

Step 1:
Identify
set-up processes


Step 2: Define a
suitable RUN
solution


Step 3:
Produce
in parallel with prime time


We look at where machine downtime occurs today: during clamping, inspection, searching, changeovers or maintenance.

We assess which machine, which pallet storage system and which clamping strategy are best suited to your workpieces.

You prepare the next job whilst the machine continues to operate. In this way, productive running time increases step by step.

Determine the level of automation

The first step must remain manageable.

RUN is not a leap into the unknown. Production remains manageable, the operator remains involved, and the benefits quickly become apparent in day-to-day operations. This is particularly important for medium-sized businesses: automation does not have to change everything straight away. It must first help in those areas where time is currently being wasted.

Discover all the benefits of CNC automation and HEDELIUS’s future-proof automation solutions in this brochure. Our 4-step model shows you, step by step, how to find the right automation solution for your production. Take the first step now!

Download the brochure for free

Get more performance from your existing machine.

RUN pays for itself through reduced downtime and more productive hours. The machine is utilised more efficiently without the immediate need for additional skilled staff or further machines. The economic benefit is particularly evident where set-ups are frequent. Every prepared pallet reduces unproductive time in the workspace. Over days, weeks and months, this translates into additional capacity. The aim: more parts produced in the same amount of time, more stable processes and less pressure on operating staff and deadlines.

Discuss potential

Frequently asked questions about the second step: RUN.

Do I need to completely overhaul my production processes for RUN?

No. RUN is intended as an introduction. The processes remain straightforward, but are organised in a more productive way.

Which parts is RUN particularly suitable for?

For individual parts, repeat parts and small to medium-sized production runs, where set-up times account for a significant proportion of day-to-day operations.

What is the biggest advantage of RUN?

The next job is prepared whilst the machine is running. This reduces downtime and allows the spindle to run productively for longer.

Will I need more staff for this?

No. In many cases, existing staff are utilised more effectively because less time is tied up directly in machine downtime.

Is RUN still a good idea even when space is limited?

Yes. RUN is particularly useful when you want to maximise operating time within the available space.

Less downtime due to set-up. More productive time.

Whether it’s READY, RUN, GROW or SCALE: what matters is not the largest automation solution, but the next economically viable step. HEDELIUS helps you to realistically assess your production and define the appropriate stage – for more spindle time, more stable processes and better planning. Simply fill in the contact form below or send an email to sales@hedelius.de. Our experts will get back to you as soon as possible!

This form requires your consent to third-party cookies. Privacy settings

Further information
Datenschutz